满城尽带黄金甲
China’s Pinglu Canal linking Guangxi with ASEAN completes its first full-route patrol, paving way to September opening_我的网站

一 | 讯 国家统计局8月17日发布2026年1—7月份全国房地产市场基本情况。

二 | 房地产开发投资完成情况 1—7月份,全国房地产开发投资43009亿元,同比下降19.2%(按可比口径计算);其中,住宅投资33172亿元,下降19.1%。 1—7月份,房地产开发企业房屋施工面积557572万平方米,同比下降12.7%。其中,住宅施工面积387051万平方米,下降13.0%。房屋新开工面积26700万平方米,下降24.0%。其中,住宅新开工面积19490万平方米,下降24.6%。房屋竣工面积19195万平方米,下降23.2%。

The inspection was carried out from Friday to Saturday by the Guangxi Maritime Safety Administration using the patrol vessel Haixun 1003.
Starting from the canal's seaward entrance, the vessel traveled northward along the entire waterway, passing through the Qingnian, Qishi and Madao ship locks, which remain under construction, while inspecting construction vessels operating along the route. It arrived at the Pingtang River estuary on the afternoon of Saturday.
It was the first time a vessel had completed the entire 134.2-kilometer journey following completion of the canal's main works, representing a breakthrough in full-route navigation tests using an actual vessel, according to Guangxi Daily.
The Haixun 1003 is the first offshore patrol vessel deployed by China's Ministry of Transport at Qinzhou Port. The vessel is 46.1 meters long and 6.8 meters wide, with a maximum speed of 25.3 knots and a cruising range of 500 nautical miles. It can withstand winds of up to Force 9 on the Beaufort scale, roughly 76-87 km/h usually with waves 6-9 meters.
The vessel is also equipped with an advanced marine electro-optical tracking and evidence-collection system capable of operating in color, monochrome, infrared and laser modes under different weather and lighting conditions. The system supports integrated data collection and transmission, Guangxi Daily reported.
During the patrol, maritime authorities conducted on-site inspections of key navigation conditions, including channel dimensions, curved sections of the waterway, navigational clearance beneath bridges, ship-lock approach channels and the mouths of tributaries.
The patrol was also designed to test the practicality of provisions contained in the Regulations on Navigation Safety Management of the Pinglu Canal, which are expected to take effect when the canal opens in September.
The results will provide a basis for refining vessel navigation rules and improving measures intended to safeguard traffic along the canal, according to the report.
Lü Jin, deputy director of the Qinzhou Maritime Safety Administration, said the inspection aims to assess the canal's navigational environment, verify whether navigational aids had been positioned appropriately, identify safety risks along the route and locate waters that could be used during emergencies.
The findings will also support the formulation of on-site supervision plans and help ensure that the canal opens safely and in an orderly manner on schedule, Lü said, according to Guangxi Daily.
The Pinglu Canal is a key project of the New International Land-Sea Trade Corridor. With total investment exceeding 70 billion yuan ($10.37 billion), the canal begins at the Pingtang River estuary in Hengzhou, administered by Nanning, follows the Qinjiang River into the Beibu Gulf, according to Xinhua News Agency.
It is China's first major river-to-sea canal project planned and coordinated at the national level since 1949 and is designed to accommodate vessels of up to 5,000 tons.
Once operational, the canal will give inland regions in Southwest China a more direct river route to the sea. Cargo that previously had to travel eastward through the Guangzhou port will be able to head south directly toward ports in the Beibu Gulf, shortening some inland waterway journeys by about 560 kilometers, according to Xinhua.
The New International Land-Sea Trade Corridor is an international trade and logistics network connecting China's western regions to ASEAN countries and other overseas markets.
It links the Silk Road Economic Belt in the north with the 21st Century Maritime Silk Road in the south while coordinating with the Yangtze River Economic Belt. China's National Development and Reform Commission released an overall plan for the corridor in 2019.
The corridor has continued to record strong trade growth. During the first half of 2026, imports and exports transported through the corridor by its participating regions reached 517.23 billion yuan, up 13 percent year-on-year and setting a new record for the same period, per data released by Chongqing municipal government.
The successful full-route patrol represents a crucial step in maritime authorities' preparations for the opening, providing data from actual vessel operations needed to improve navigation management, emergency planning and safety arrangements ahead of commercial operations, Guangxi Daily reported.
Global Times
。其中,住宅竣工面积13443万平方米,下降25.5%。 新建商品房销售和待售情况 1—7月份,新建商品房销售面积45021万平方米,同比下降11.8%;其中住宅销售面积下降12.7%。新建商品房销售额42718亿元,下降13.1%;其中住宅销售额下降13.2%。 7月末,商品房待售面积75911万平方米,同比下降0.8%。其中,待售3年以下面积55559万平方米,下降3.6%。

三 | 房地产开发企业到位资金情况 1—7月份,房地产开发企业到位资金45748亿元,同比下降20.3%。其中,国内贷款6300亿元,下降32.1%;自筹资金16544亿元,下降18.5%;定金及预收款14376亿元,下降14.4%;个人按揭贷款6040亿元,下降23.5%。版权申明:凡注有“”或电头为“”的稿件,均为独家版权所有,未经许可不得转载或镜像;授权转载必须注明来源为“”,并保留“”的电头。 。
Current article:http://www.jiubengtaibingpengou.pics/list_g1ztu/xes.xls
Published on:02:18:03
